Member onboarding - original creator workflow
40 nodes · 35 non-note nodes
Open read-only HTML explorer →Download explicitly sanitized review JSON
Built systems
Onboard makes the member setup journey easy to follow from a won Close CRM opportunity through Airtable, Mighty Networks, Intercom and Slack. Its checkpoint interface brings stage status and failure handling into a clear operating view for the team.

Local members and checkpoints.

Scripted local, not a real provisioning attempt.

Status, not live connection health.

Published creator source imported locally: 40 nodes, 35 non-note. Inactive; never executed here.

Native source detail. Provider credentials have been removed.

Native-source detail crop. Original branch logic shown without credentials or execution.
Gives onboarding operators a clear view of setup progress and the specific handoff that needs attention.
40 nodes · 35 non-note nodes
Open read-only HTML explorer →Download explicitly sanitized review JSON
Engagement documentation and dashboard source inspection.
Native n8n imports are local and inactive, not production execution. Historical recording capture dates are unknown; a displayed report period is not its capture date. Local source review: October 27, 2026. Public release and client-material clearance remain separate.
The original workflow validates the opportunity status and email, fetches the CRM context and routes the member by program tier. The published description identifies five or more manual setup steps that this links together.
Airtable tracking, the Mighty Networks invitation, the Intercom profile and Slack notifications are distinct handoffs. The original source includes step-specific error paths, so the operator can identify what still needs attention.
The native n8n views come from the published JSON, with forty source nodes including five notes.
$600 in manual work. That is a cost model, not an observed project saving. Completion time and the actual destination records need checking before claiming the achieved reduction.
Documented onboarding path and recovered workflow source; not current provider acceptance.
Reconstructed interface with member records.
| View | Provenance and limitation | Evidence class |
|---|---|---|
| Fig. 1 | Member onboarding pipeline Local members and checkpoints. | Product interface |
| Fig. 2 | Step-specific retry timeline Scripted local, not a real provisioning attempt. | Product interface |
| Fig. 3 | Integration checkpoint view Status, not live connection health. | Product interface |
| Fig. 4 | Original CRM-to-member onboarding workflow Published creator source imported locally: 40 nodes, 35 non-note. Inactive; never executed here. | Local import only |
| Fig. 5 | Member provisioning and failure handoff Native source detail. Provider credentials have been removed. | Local import only |
| Fig. 6 | Mighty Networks plan check and status writeback Native-source detail crop. Original branch logic shown without credentials or execution. | Local import only |
Engagement documentation and dashboard source inspection.
Native n8n imports are local and inactive, not production execution. Historical recording capture dates are unknown; a displayed report period is not its capture date. Local source review: October 27, 2026. Public release and client-material clearance remain separate.
Reviewed: 2026-10-27
Bring one workflow and the output the next person needs. Define its inputs, review decision and completion check before agreeing implementation scope.